top of page

News blog

WATER RETENTION MEASURES

  • Writer: Aenki e.V.
    Aenki e.V.
  • Apr 18
  • 1 min read

Different types of water retention measures were tested before the rains started in late March/early April. A two-day visit from an excavator helped to dig a 15x50m water pan; we continued by hand with a series of 20 half-moon circles to capture the water run-offs for the newly planted trees.

 
 

© 2025 by Aenki eV All rights reserved.        Privacy Policy

bottom of page