SOIL BLOCK PRODUCTION

May 10
1 min read
After a lot of testing, we managed to get the right soil from a neighboring village and started block production. with a capacity of about 500 blocks per day, the construction team is slowly getting into the rythm ; Patrick is there for quality control.




