top of page

News blog

ROAD WORK

  • Writer: Aenki e.V.
    Aenki e.V.
  • May 17
  • 1 min read

Updated: May 27


In April and May, the main axes of the property were connected by a road, and the soil was compacted and developed (towards Gates 1 and 2). To save costs, a small business is being set up so that the stones can be quarried and crushed on site. This will minimize transport costs for gravel.

 
 

© 2025 by Aenki eV All rights reserved.        Privacy Policy

bottom of page